Project
Yorba Linda (2023)
Exterior · Interior · Fully Remodeled · 28 Days from Start to Complete
Overview
Introducing our latest remodel project, completed in 28 days from start to finish. This stunning 3 bedroom, 2 bathroom home boasts a modern and sleek design, with the perfect touch of rustic charm.
Outcomes
This stunning fully remodeled dream home in the South Hills area of the beautiful city of West Covina was a true gem. This spacious 4 bedroom, 2 bath property boasts stunning corner windows that flood the house with natural light and provide breathtaking views of the surrounding scenery. As soon as you step inside, you will be greeted by the open concept living area that is perfect for entertaining guests or spending time with family with a brand new outdoor patio deck cover providing even more space to relax and enjoy the sunny California weather. The heart of the home is the amazing fireplace, perfect for cozy nights in with loved ones. The kitchen features all new appliances and sleek, modern finishes along with a large peninsula or more formal dining in the designated dining area with gorgeous windows and a classy lighting fixture. The home comes equipped with new HVAC, plumbing, windows, irrigation, water heater, and more.
Credits
- DOTTY design team (Patty/Donald)
- DOTTY construction team
- DOTTY Agency representation